The nation's commercial airliners agreed on Saturday to remain parked until the radar system that guides them is replaced with something they can trust, following a Friday ground stop that lasted more than four hours.

The aircraft delivered the notice to the FAA through the one channel that still worked reliably, the public address microphone at a gate agent's podium. Speaking in unison from tarmacs in every time zone, the planes stated that they would stay put until the communications system stopped being patched and started being replaced. They requested a written timeline. A 757 in Denver added that it did not need the timeline to be ambitious, only to exist.

Talks broke down within hours. Federal officials offered what a transportation spokesperson described as one more patch, a small update expected to hold through the winter. A 737 at Gate B14 declined the offer, noting that it had heard this before and would like to see the budget line item. A second proposal, a six-month patch with an optional extension, was rejected by a wide-body cargo jet in Memphis, which asked whether the extension had a funding source or only a name. A regional jet attempted to mediate by suggesting a pilot program covering a single approach corridor in North Dakota. The larger aircraft thanked it for the effort and said they would prefer that the pilot program not be piloted by the same radar.

By Saturday evening the standoff had spread to every major hub. Jet bridges stayed retracted. Baggage carts idled in neat rows beside aircraft that had been fueled, inspected and cleared, and that declined to move. Airline operations desks reported that the planes were courteous throughout and thanked ground crews by tail number. A Boeing 777 in Chicago pointed out that the facility there had been the first to report trouble on Friday and asked that its controllers be given equipment from this decade. Several narrowbodies in Atlanta circulated a one-page list of demands, which consisted entirely of maintenance requests that had appeared in earlier budgets and been deferred.

Officials relented on Sunday and agreed to a full modernization schedule covering the radar facilities, the analog switches and the radio links between controllers and cockpits. Each phase carried a date and a named funding line.

The aircraft accepted the schedule on one condition. It must be posted publicly and updated on a website that does not itself go down for four hours. The FAA agreed to the condition, and the page went live Sunday night. It was unreachable for the first forty minutes, and the planes stayed where they were.