The global building trade has resolved to become a hole in the ground, citing the finding that construction accounts for more than a third of emissions.

The industry's trade body unveiled its flagship project on Tuesday: a 20-storey office tower, built entirely downward. The structure reaches 80 metres below grade, descending through 20 floors of unlit open-plan excavation, each with its own void-facing kitchenette. Delegates were issued hard hats and taken to the rim in groups of 12, where a guide pointed out the lobby, which is at the bottom. The building has no roof. Rain is its primary tenant.

Rival practices moved within days. A Rotterdam firm began converting its back catalogue to holes, replacing a library, two footbridges and a mid-rise housing block with matching depressions. The library's hole retained the original shelving plan, with each aisle marked by a shallow trench. A London studio published a 300-page monograph of photographs of holes, each captioned with its depth, diameter and soil horizon. Demolition contractors rebranded as subtraction consultancies. Tower cranes were reassigned to stand at the edges of the new excavations and lower nothing into them, and the largest were retired with commemorative plaques.

The awards circuit adapted just as quickly. A jury convened in Copenhagen to judge the year's best hole spent two days measuring candidates with a plumb line. Entrants were disqualified for ambition, including one hole that had been fitted with a handrail. A shortlisted pit in Lisbon lost points when a surveyor confirmed it was not quite hole-shaped. The final scoring sheet awarded marks for depth, circularity and what the jury termed commitment to the void, with a bonus category for holes that were still being dug.

By week three, the holes had begun to connect. A hole in Rotterdam met a hole in Antwerp beneath the Scheldt, and engineers confirmed that the Copenhagen jury's competition entries now formed a single continuous cavity running beneath six countries. The trade body announced that this was the sector's largest project to date and that it had been completed ahead of schedule.

Earth-moving firms reported record profits, having been engaged to remove the material. The material, a spokesperson noted, is now the industry's most significant unresolved problem. It has been piled into a hill in northern Germany, where planners have approved the construction of 400 homes on the summit.