The Senate advanced bipartisan permitting legislation Monday, a bill meant to shorten the time it takes to approve large infrastructure projects. The procedural vote passed with a bipartisan majority.
Within minutes, the bill's effective date was found to be last Tuesday.
Senators learned of it when a transmission line appeared in the Senate parking lot, running between two reserved spaces and a bicycle rack. A completed environmental impact statement was stapled to its base, addressed to nobody. The line was energized. By midafternoon, a pipeline had been laid down the center aisle of the Hart Building atrium, and a natural gas compressor station sat humming in a cafeteria alcove, its exhaust routed through the soft-serve machine.
Environmental review proved the first casualty of the efficiency. The statutory 60-day public comment period was completed in four seconds, which staff described as the time needed to print the notice. Comments were received from one resident of a county that has not yet been drawn on any map, and the comment consisted of the word "pending." Community input sessions were held, adjourned, and certified in an empty school gymnasium. The sign-in sheet listed the attendees as the folding chairs.
Federal agencies responded by issuing a joint memorandum extending their own deadlines to a date before the bill's passage, in an effort to restore a review period. The memorandum was approved at once and built into a small annex in the Eisenhower Executive Office Building. The annex has no windows and is occupied by the memorandum.
The courts were next. A federal district judge received a petition to halt construction of the cafeteria compressor station and ruled that the station was too far along to enjoin, having already been inspected, decommissioned, and reopened as a commemorative plaque. An appeals court granted standing to the soft-serve machine. The Army Corps of Engineers filed an amicus brief on behalf of a wetland that the transmission line had been routed around, then through, then reclassified as a rest area.
The Congressional Budget Office reported that the bill had cost nothing to implement, since every project it touched was paid for by the permit. The Office of the Parliamentarian confirmed that every bridge, pipeline, substation, and datacenter in the country now held a valid permit and a signed finding of no significant impact. Several of the findings were issued for places not yet reached by surveyors.
The only structure left unbuilt was the hearing room set aside for objections. Its permit was approved Monday evening, its public comment period closed with no comments, and its floor plan was filed without a door.